14.8 Acres - Park/Playground
5800 Loyola Street
Parking and Access
Summary
- large climbing structure with four slides
- our adult swings and two baby swings
- ground under the play structure and benches is Fibar Safety Surface
- paved walking and biking path with four benches along it surround the park
- please be aware that there are no restrooms available at this park
Facilities History
- Playground equipment added (11/98) $21,233.00
- Fibar felt added (8/99) $900.00
- Fibar Surface added (8/99) $6,250.00
- Playground equipment added (6/99) $5,118.00
- Playground equipment added (6/99) $14,124.00
- Lumber added (6/99) $1,352.40
- Safari unit installed (7/99) $4,210.00
- Large structure installed (7/99) $21,233.00
- Landscaping done (7/99) $1,735.00
- Concrete installed (8/00) $196.50
- Fibar added (8/00) $58.68
- Swing set (7/00) $753.00
Acquisition
Brookfield Park was deeded to the Lower Macungie Township April 17, 1998, by the developer at no cost to the township. Recorded by deed volume 1631, page 500. This park is part of a subdivision.